Inflatable docks & bespoke structuresNeed advice? +33 7 67 52 34 88

DESIGN & MANUFACTURING

Quality starts
in the workshop.

Before your days on the water come the materials, assembly and work in the workshop. Go behind the scenes of AIRDOCK manufacturing.

Understand the construction

Manufacturing photographs published on the AIRDOCK France website.

Concept diagram, not to technical scale.

WHAT MAKES UP YOUR DOCK

Three elements.
One complete structure.

01

EVA, the contact surface

The top covering provides the feel and teak-effect finish.

02

The outer skin

It covers the structure and forms the wall of the inflatable equipment.

03

Double-wall fabric

DWF connects the two faces and forms the deck when the structure is inflated.

View dock sizes

BEYOND THE PRODUCT

Understand
what you are buying.

Quality concerns the product, but also the people who make it and the information that accompanies it.

Let’s talk manufacturing
01

Working conditions

Workshop organisation, team protection and risk prevention are the areas to examine when assessing a responsible approach.

02

Material traceability

Composition, material origins and batch references help explain and document the manufacturing process.

03

Quality checks

Assembly, watertightness and pressure retention: procedures and test reports are the documents to consult when assessing the checks carried out.

QUALITY, HEALTH & ENVIRONMENT

Three standards
to go further.

A selection of standards to structure an approach to manufacturing improvement.

Proposed approach · certifications not verified

ISO 9001

Structure quality management.

A framework for organising processes, monitoring quality and improving manufacturing practices.

Understand the standard

ISO 45001

Protect teams.

A framework for preventing occupational risks and improving health and safety at work.

Understand the standard

ISO 14001

Manage impacts.

A framework for identifying environmental impacts and improving resource and waste management.

Understand the standard

These standards are proposed for AIRDOCK; they do not constitute a statement that the brand or its manufacturer is certified. They concern management systems, not product approval.

NEED A SPECIFIC SIZE?

Your project deserves
its own AirDock.

Explore bespoke designs

TO PREPARE YOUR PROJECT

Useful guidance.

Compare equipment and find advice for your configuration.